Onshore Products

Complete line of surface equipment in accordance with API 6A and qualified under strict PR2 performance tests.

Offshore Products

Sub-surface equipment, such as Mudline Suspension System, Wet Christmas trees and Manifolds, in accordance with API 17D.

Surface Safety

Integrated control systems designed to close a well in unusual conditions, accidental operation or irregularities.

Services

Maintenance, repair and installation services. Training programs on our full product line for customers and employees. Access to specialized submarine laboratory.

Research and Development

 Engineering Department

Our engineering team is highly qualified to design surface, completion, fracking and safety surface equipment customized to the clients’ specific needs. We have developed special equipment focused on reducing the total cost of operation.

We know that working together with our clients and combining our knowledge and experience creates synergies allowing us to achieve the best results in the shortest possible time.

 Design Tools

We use the highest technology tools available in the market for project development and component analysis, ensuring a higher reliability of our products.

We offer our customers tailor-made systems for specific applications, providing cost effective solutions with the highest technology available.

We also use a FEA simulation module, which allows the resolution of complex calculations in a short time, with more accurate and precise results.

 PR2 Laboratory

The PR laboratory installed at WEB NORDESTE is equipped with high technology software and instruments. These tools allow a more accurate analysis of prototype behavior in extreme operating conditions. Resulting in products that comply with the highest requirements of the applicable standards.

 Performance Tests

We conduct our own performance tests according to API 6A Annex F, PR2 level in order to qualify the product for the required service. These tests guarantee the necessary reliability to meet the internal and external market needs for oil and gas.

 Fire Test Lab

We have a modern fire test laboratory for valves. It simulates extreme operating conditions in order to qualify valves to meet API 6FA requirements.

 Test Stand for CC and Mudline

Our test stands allow us to test and simulate equipment assembly under conditions similar to those on the field, both on-shore and off-shore.

Latest News

WEB NORDESTE once again stands out in the Brazilian scenario providing subsea equipment for offshore application

Using its entrepreneurship and technical capabilities in Engineering and Manufacturing, WEB Nordeste supplied two Flying Lead Depl...

27-07-2018 News 0

WEBNORDESTE is at OTC focusing on markets in North America and Asia

HOUSTON - Webnordeste is participating in the OTC and has obtained good results in its contacts made in the Brazil Pavilion. At th...

10-05-2018 News 0

Praised by the consortium TTP76

WEB Nordeste is praised by the consortium TTP76, due to the technical services of excellence, provided for consolidation of the mo...

22-01-2018 News 0

FPSO P75 e P77

Under a two FPSO contract, WEB Nordeste delivers the latest 376 large capacity valves for the FPSO P75 and P77...

22-01-2018 News 0

Manifold Onshore Delivery

WEB Nordeste, advises with engineering solutions local companies, providing design and delivery plus a large onshore manifold...

22-01-2018 News 0

Subsea Valves

With a large investment in technology, WEB Nordeste completes tests on one of the underwater christmas trees contracted...

22-01-2018 News 0

Subsea Valves Test

Conduct final approval tests on underwater valves under customer inspection...

22-01-2018 News 0

Delivery of products to P&G

The international market is surprised by the quality and punctuality in delivering products to P & G, requesting more block tr...

22-01-2018 News 0

Delivery to Repsol Bolivia

Delivery of 7.1 / 16 "10.000 psi block Christmas trees for Repsol Bolivia...

22-01-2018 News 0

Mudline Test

The final approval test of the 30 "x 20" x 13-3 / 8 "x 9-5 / 8" x 7 "Mudline Suspension System, manufactured entirely in Brazil, w...

22-01-2018 News 0

Installation subsea suspensors system in Rio Grande do Norte (MUDLINE SUSPENSION SYSTEM)

On December 6, 2010, WEB Nordeste successfully completed the installation of a "Mudline MJ1", 30 "x 20" x 13 3/8 "x 9 5/8" x 7 "In...

22-01-2018 News 0

We concluded in Urucu the pioneering installation in Brazil of the Compact WellHead of 13-3 / 8 "x 9-5 / 8" x 7 "

This head allows minimizing the number of probe time interventions by having an integrated coating head and production design, sub...

22-01-2018 News 0