Error
  • The template for this display is not available. Please contact a Site administrator.
Print this page
Monday, 22 January 2018 14:24

We concluded in Urucu the pioneering installation in Brazil of the Compact WellHead of 13-3 / 8 "x 9-5 / 8" x 7 "

Rate this item
(0 votes)

This head allows minimizing the number of probe time interventions by having an integrated coating head and production design, substantially reducing the cost of the operation. This installation has been giving satisfactory results and opens up a new spectrum in the supply of production heads.

Read 2801 times Last modified on Monday, 22 January 2018 15:33