We concluded in Urucu the pioneering installation in Brazil of the Compact WellHead of 13-3 / 8 "x 9-5 / 8" x 7 "

  • Monday, 22 January 2018 14:24

This head allows minimizing the number of probe time interventions by having an integrated coating head and production design, substantially reducing the cost of the operation. This installation has been giving satisfactory results and opens up a new spectrum in the supply of production heads.

  • 790
  • Last modified on Monday, 22 January 2018 15:33

In other news